
House Construction in Multan - Grey Structure & Turnkey
Whether you need a grey structure contractor to complete the shell of your home or a fully turnkey build that is ready to move into, Tayyab Builders manages every stage of house construction in Multan - from naqsha to final handover.
What's Included
As a home builder in Multan, we offer flexible scopes so you only pay for what you need:

Grey Structure
Foundation, columns and beams, brickwork, roof slab, and rough plumbing and electrical piping - the complete shell of your home, ready for finishing whenever you choose.
Full Turnkey Construction
Everything in grey structure plus flooring, paint, doors, windows, kitchen and bathroom fittings, and final finishing touches - a genuinely move-in ready home with a single point of contact.
Custom & Partial Packages
Prefer to split the work in stages? We also take on partial packages - grey structure plus specific finishing phases - built around your budget and timeline.
Our Construction Process
- 01
Naqsha & Planning
We finalize your house map (naqsha), structural drawings and material specifications before a single brick is laid.
- 02
Foundation
Excavation, footing and foundation work suited to your plot's soil condition and the number of floors planned.
- 03
Grey Structure
Columns, beams, brickwork and roof slab go up under regular site supervision, with structural checks at every stage.
- 04
Finishing
Flooring, paint, electrical and plumbing fixtures, kitchen and bathroom fittings, doors and windows are installed to your chosen finishing grade.
- 05
Handover
A final walkthrough and quality inspection, followed by a clean handover with complete documentation.
Materials & Quality Standards
Every gray structure contractor claims quality - we back it up with a consistent process on every site:

Trusted Material Brands
Cement, steel and bricks sourced from reputable suppliers, matched to the structural requirements of your specific design.
Structural Engineering Review
Structural drawings are checked against your naqsha before construction begins, so the design holds up in practice, not just on paper.
On-Site Quality Checks
Our site supervisors inspect key stages - foundation, structure and finishing - before work moves to the next phase.
What Affects Your Construction Cost
Every plot and every project is different, so we avoid publishing fixed rates online. These are the main factors that shape your final house construction cost in Multan:
- Plot size and shape
- Grey structure only vs. full turnkey scope
- Finishing grade - standard, premium or fully custom
- Site access and location within Multan
- Structural requirements, including number of floors and foundation type
Frequently Asked Questions
Grey structure or turnkey - which is better?
It depends on your budget and timeline. Grey structure gives you the complete shell at a lower upfront cost and lets you handle finishing in stages or on your own schedule. Turnkey construction costs more overall but hands you a fully finished, move-in ready home with one contractor managing everything - no coordinating separate teams for tiling, paint and fittings. We can walk you through both options against your specific plot and budget.
How long does house construction take in Multan?
Timelines depend on plot size, structure type and finishing grade, but a typical residential home generally takes a few months for grey structure and additional time for finishing work. We share a realistic, project-specific timeline after the initial site visit and keep you updated at every stage.
Do you provide a written estimate before starting work?
Yes. After visiting your plot and understanding your requirements, we provide a detailed, itemized estimate so you know exactly what is included before construction begins.
You Might Also Need
Ready to Talk About Your Project?
Share your plot size, location and whether you're planning grey structure or turnkey construction, and our team will get back to you with a free site visit and estimate.
Or call us directly: +92 325 8766584
